In operation
Sergies, is a public project developer of renewable energies power plant. Sergies has entrusted us with the turnkey construction of a 3.6MWp ground-mounted photovoltaic power plant. The plant is located in the town of Montmorillon, a town of 6,500 inhabitants, sub-prefecture of the Vienne department. This plant will enhance the value of the land of a technical landfill centre.
Thanks to its specific technical knowledge concerning the installation of a power plant on former landfill, Entech was chosen to design and build all the electrical engineering and PV structures.
The plant has been in operation since August 2021 and produces the equivalent of the consumption of approximately 900 households per year, i.e. 4,170 MWh.
- 3,6 MWp
- Technical Landfill Centre
Implementation of concrete foundations. The panel structures rest on these concrete foundations